{
  "package": "PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip",
  "version": "FDB-0020",
  "coverage": "All approved history through FDB-0019 plus Stage G-B3 REV2 third-party public industry engineering reference evidence augmentation",
  "audit_decision": "PASS WITH CONTROLLED THIRD-PARTY REFERENCE BOUNDARY",
  "previous_baseline_sha256": "bdc053133a5ce6b3280c73ff0078d7fdf2f8d6915b7f48c714120453e47453b9",
  "approved_payload_sha256": "883c3f8ad5a8b00ff79f205704fb65a16b01bdd12ae7b6e5ba39bd8b84d27f53",
  "third_party_sources": 25,
  "third_party_reference_evidence": 25,
  "conditional_evidence_coverage": "228/228",
  "open_gap_reference_coverage": "35/35",
  "industry_reference_benchmarks": 24,
  "internal_controlled_evidence_promotion": 0,
  "internal_gap_closure": "NOT PERFORMED",
  "next_authorized_activity": "Use frozen third-party reference context to guide controlled internal evidence acquisition/validation; do not substitute it for factory-specific evidence."
}