Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

ACQREQ-G-B4-000127

Registry: acquisition_requirement_consolidation_registry. Original field names and values are displayed without translation or reinterpretation.

Acquisition_Requirement_ID
ACQREQ-G-B4-000127
Can_Be_Satisfied_By_Existing_Record
YES_EXISTING_RECORD_FIRST
Consolidation_Reason
One existing-record search gate is retained for GAP-C-000010 and its frozen Stage E/Stage F package before any contingent new test is authorized.
Engineering_Domain
STRUCTURAL|PRODUCT_CONFIGURATION
Priority
P1_OPEN_GAP_EXISTING_RECORD_SEARCH
Related_Conditional_Evidence_Count
0
Related_Conditional_Evidence_IDs
NONE_DIRECTLY_MAPPED
Related_Gap_IDs
GAP-C-000010
Required_Batch_or_Lot
APPLICABLE_BATCH_LOT_OR_SERIAL_REQUIRED
Required_Material
APPLICABLE_MATERIAL_IDENTITY_TO_BE_DECLARED
Required_Model_or_Family
APPLICABLE_COMPANY_MODEL_OR_FAMILY_TO_BE_DECLARED
Required_Process
APPLICABLE_PROCESS_AND_PROCESS_REVISION_REQUIRED
Required_Record_or_Test
Obtain controlled section drawings, assembly procedures, material identities, and representative load spectra before joint validation.
Required_Revision
DOCUMENT_ID_REVISION_EFFECTIVITY_AND_CHANGE_HISTORY_REQUIRED
Required_SKU
APPLICABLE_SKU_TO_BE_DECLARED
Required_Test_Context
STRUCTURAL_TEST
Requirement_Category
TEST_REPORT
Requires_Calibration_Record
YES_AS_APPLICABLE
Requires_Internal_Engineering_Record
NO
Requires_Material_Identity
YES_AS_APPLICABLE
Requires_New_Test
NO_AT_THIS_ACTION
Requires_Production_Record
NO
Requires_QA_Record
YES_AS_APPLICABLE
Requires_Sample_Identity
YES
Requires_Supplier_Document
NO

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/stage_g_b4_internal_evidence_acquisition_campaign/approved_payload/STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_DATABASE_REV1.zip!/STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_DATABASE_REV1/planning/acquisition_requirement_consolidation_registry.csv
source_file_sha256
4f0884d93a6c583b7b495c8656103207b65c1d6e7222b524741247bfc096277d
source_locator
csv:row:127
fields_sha256
b08f028c641e7b15884b736423e45f6282b2bb5655222965e33b77171070b5eb
source_version
FDB-0025