FDB-0025 ยท ORIGINAL SOURCE VALUE
VGATE-D-000274
Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.
- Blocking_Gap_IDs
- GAP-C-000030|GAP-C-000031|GAP-C-000032|GAP-C-000034|GAP-C-000035
- Domain_ID
- D11
- Gate_Status
- PADDLE_DATA_REQUIRED
- Required_Boundary_Condition
- EXPLICIT_IN_VALIDATION_REQUIREMENT
- Required_Data
- MATERIAL_IDENTITY_DATA|SPECIMEN_OR_ARTICLE_CONFIGURATION|PROCESS_CONDITION_OR_LOAD_RECORDS|RAW_AND_REDUCED_MEASUREMENT_DATA
- Required_Documentation
- EXPLICIT_IN_VALIDATION_REQUIREMENT
- Required_Instrumentation
- NOT_EXPLICIT_IN_VALIDATION_RECORD
- Required_Test
- Document deformation mode, strain amplitude, frequency, temperature, specimen geometry and material state, verify linear response, and correlate any material-property model to separate structural modal tests.
- Target_ID
- REL-D-000274
- Target_Type
- ENGINEERING_RELATIONSHIP
- Unlock_Condition
- Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
- Validation_Gate_ID
- VGATE-D-000274
- Validation_IDs
- VAL-C-000274
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
- source_file_sha256
- d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
- source_locator
- csv:row:274
- fields_sha256
- 55b77017805708f07dd865e0a6feab2ca4a1595bc597c0933962e07a0331fadd
- source_version
- FDB-0025