Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

RCE-G-B2-000005

Registry: remaining_conditional_evidence_registry. Original field names and values are displayed without translation or reinterpretation.

Control_Completeness_ID
CC-G-B2-000005
Current_Model_or_Family
Vokar - Red 呐喊系列 - 红色
Engineering_Claim_Status
NOT_CREATED
Engineering_Record_ID
ERC-G-B1-000007
Evidence_State
CONDITIONAL_EVIDENCE
Evidence_Statement
系列中英文名: Vokar S1 呐喊系列 | 产品中英文名: Vokar - Red 呐喊系列 - 红色 | 模具型号: JT-1 | 工艺: 冷切 | 厚度: 14mm | 拍芯结构: PP 蜂窝 | 拍面材质: T300 光面 3层碳纤维 | 尺寸: 长度:398mm/15.67-inch 宽度:198mm/7.8-inch 握把长度:127mm/5.0-inch 握把周长:112mm/4.41-inch | 重量: 220±5g
Evidence_Type
PRODUCT_CONFIGURATION_DECLARATION
Gap_Closure_Status
NOT_CLOSED
Internal_File_ID
INTFILE-G-B0-004121
Missing_Control
Missing governed revision/approval and controlled specification, BOM, drawing or material context required to control the declaration.
Missing_Control_ID
MC-G-B2-000005
Original_Conditional_Evidence_ID
EVID-G-B1-000005
Remaining_Conditional_Evidence_ID
RCE-G-B2-000005
Requalification_ID
REQ-G-B2-000005
Required_Next_Action
Provide APPROVED_PRODUCT_SPECIFICATION, BOM, ENGINEERING_DRAWING, REVISION_APPROVAL_RECORD in a governed company-internal location, then perform source-scope review, atomic content extraction, context linking and control-completeness review.
Review_Status
REVIEW_REQUIRED
Why_Remains_Conditional
Remain Conditional: source identity and declared configuration are preserved, but governed revision/approval and required specification/BOM/drawing/material controls are missing; no supporting context link exists.

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/stage_g_b2_conditional_evidence_enrichment/approved_payload/STAGEG_CONDITIONAL_EVIDENCE_CONTROL_ENRICHMENT_DATABASE.zip!/STAGEG_CONDITIONAL_EVIDENCE_CONTROL_ENRICHMENT_DATABASE/evidence/remaining_conditional_evidence_registry.csv
source_file_sha256
fbcfad47f4bf4fdc9916c00c0605fce97272d3661b183616776b902bbb7c9ff7
source_locator
csv:row:5
fields_sha256
8dd412dc6430869bd0dbc3da5deeaa7c11c556556a9c77056d8351199164d75f
source_version
FDB-0025