Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

CORE-B-000005

Registry: STAGEB_CORE_INTELLIGENCE. Original field names and values are displayed without translation or reinterpretation.

acoustic_implications
No generalized acoustic claim.
advantages
Resilient foam material provides an engineering alternative to honeycomb-only structure.
bonding_requirements
Requires interfaces to adjacent honeycomb/EVA/face layers in hybrid systems.
canonical_name
EPP foam core
cell_structure
foam cell structure
claim_ids
CLM-B-000049
common_paddle_usage
Verified as an element of HEAD TRIFLEX hybrid architecture.
confidence
HIGH
core_family
FOAM_DOMINANT
core_id
CORE-B-000005
density_information
No paddle-general density asserted.
durability_implications
Architecture specific.
evidence_ids
EVD-B-000073;EVD-B-000074
failure_modes
compression/fatigue/interface separation possible
limitations
Not all full-foam cores are EPP.
manufacturing_complexity
HIGH
manufacturing_method
foam molding + hybrid assembly/bonding
material
Expanded polypropylene
notes
Core family is separate from core thickness; no 14 mm/16 mm family creation.
process_compatibility
foam molding; hybrid core bonding
production_eligible
YES
source_ids
SRC-B-000041;SRC-B-000042
structural_role
core or hybrid-core structural layer
structure
closed-cell expanded thermoplastic foam core
thickness_applicability
Product/system specific.
verification_status
VERIFIED

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_FOUNDATION_MAPPING_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH006_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH005_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH004_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH003_2026-09-10.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH002_2026-09-10.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH001_2026-09-10.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEB_2026-09-09.zip!/frozen_history/PICKLEBALL_DATABASE_STAGEB_ENGINEERING_INTELLIGENCE_PASS_FROZEN_BASELINE_v1.zip!/STAGEB_CORE_INTELLIGENCE.csv
source_file_sha256
a444642b208c85f8a2b5958137308db95402e8802ce591e43a52b74043cecec5
source_locator
csv:row:5
fields_sha256
5036cbe1dcf81a27e8199ed9675cbf0de99c92a438a8f18ef1a9fcfecb1c0ed7
source_version
FDB-0025