Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

FACE-B-000002

Registry: STAGEB_FACE_SYSTEM_INTELLIGENCE. Original field names and values are displayed without translation or reinterpretation.

canonical_name
T700 carbon peel-ply textured face system
claim_ids
CLM-B-000064;CLM-B-000065
coating
none required by definition
confidence
HIGH
decorative_layer
optional graphics
durability_considerations
Texture wear and laminate durability remain product/process dependent.
evidence_ids
EVD-B-000102;EVD-B-000103;EVD-B-000104
face_system_id
FACE-B-000002
laminate_structure
carbon laminate with peel-ply-conditioned surface
manufacturing_process
laminate cure + peel-ply removal
notes
Face system is modeled as a stack/process, not as a single marketing material label.
production_eligible
YES
reinforcement_type
carbon reinforcement
resin_system
resin system not universally disclosed
source_ids
SRC-B-000043;SRC-B-000023
spin_claim_status
BRAND_OR_PRODUCT_TEST_REQUIRED
structural_face_material
T700-grade carbon composite
surface_texture_method
peel-ply/release-fabric cured texture
texture_retention_considerations
Peel-ply texture is integral to cured surface topography but can still wear in service.
thickness_information
Product-specific.
verification_status
VERIFIED
weave_or_orientation
brand/product-specific layup; may be angled

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_FOUNDATION_MAPPING_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH006_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH005_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH004_2026-09-11.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH003_2026-09-10.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH002_2026-09-10.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEC_BATCH001_2026-09-10.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEB_2026-09-09.zip!/frozen_history/PICKLEBALL_DATABASE_STAGEB_ENGINEERING_INTELLIGENCE_PASS_FROZEN_BASELINE_v1.zip!/STAGEB_FACE_SYSTEM_INTELLIGENCE.csv
source_file_sha256
94dc3077294513a5569bbb539fe906b7852ce20918becb5526a8bdc970fcb8a4
source_locator
csv:row:2
fields_sha256
28807895de50edfedbdbb468292ee3c9c34039c941324556bc4d90e645dc968e
source_version
FDB-0025