Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

TPE-G-B3-000013

Registry: third_party_reference_evidence_registry. Original field names and values are displayed without translation or reinterpretation.

Boundary_Context
Advisory guidance is not mandatory regulation and does not establish internal compliance.
Configuration
Qualification and production processes
Engineering_Domain
PROCESS|QUALITY|COMPOSITES
Evidence_Locator
Archived FAA AC 20-107B Change 1 snapshot, PDF p.3 (printed p.2), §6.a.(1)
Evidence_Type
PROCESS_GOVERNANCE_REFERENCE
Gap_IDs
GAP-C-000002|GAP-C-000003|GAP-C-000005|GAP-C-000006|GAP-C-000009|GAP-C-000011|GAP-C-000013|GAP-C-000014|GAP-C-000016|GAP-C-000018|GAP-C-000019|GAP-C-000020|GAP-C-000021|GAP-C-000022|GAP-C-000023|GAP-C-000024|GAP-C-000026|GAP-C-000027|GAP-C-000028|GAP-C-000029
Material
Composite/sandwich materials
Normalized_Evidence
Composite qualification guidance links controlled specifications, representative processes, batch acceptance and production consistency.
Parameter_Name
Material/process specification control
Raw_Evidence_Text
Material specifications are required to ensure consistent material is being procured
Reference_Status
QUALIFIED_REFERENCE_EVIDENCE
Research_Requirement_ID
TPRR-G-B3-000009
Test_Method
FAA AC 20-107B with Change 1
Third_Party_Evidence_ID
TPE-G-B3-000013
Third_Party_Source_ID
TPS-G-B3-000013
Unit
Value

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/stage_g_b3_third_party_industry_evidence_augmentation/approved_payload/STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_DATABASE_REV2.zip!/STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_DATABASE_REV2/evidence/third_party_reference_evidence_registry.csv
source_file_sha256
abe32376f1a3fb9b526052ed3ea204f72c7ba0fef00720b7437af4616a28d759
source_locator
csv:row:13
fields_sha256
8cd7259fe5d778b23a3a25b25e4d8772efc7fa06fa86e725a8e0de16e657bbd5
source_version
FDB-0025