Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

VGATE-D-000189

Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.

Blocking_Gap_IDs
GAP-C-000013|GAP-C-000023
Domain_ID
D06
Gate_Status
CONTROLLED_TEST_REQUIRED
Required_Boundary_Condition
EXPLICIT_IN_VALIDATION_REQUIREMENT
Required_Data
MATERIAL_IDENTITY_DATA|PROCESS_CONDITION_OR_LOAD_RECORDS|RAW_AND_REDUCED_MEASUREMENT_DATA
Required_Documentation
EXPLICIT_IN_VALIDATION_REQUIREMENT
Required_Instrumentation
NOT_EXPLICIT_IN_VALIDATION_RECORD
Required_Test
Record prepreg lot and out-time, substrate, application force and rate, dwell, peel rate and angle, temperature, humidity, width, and force response.
Target_ID
REL-D-000189
Target_Type
ENGINEERING_RELATIONSHIP
Unlock_Condition
Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
Validation_Gate_ID
VGATE-D-000189
Validation_IDs
VAL-C-000189

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
source_file_sha256
d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
source_locator
csv:row:189
fields_sha256
2d5eb7fa3df6fba3d2db0b3eeb3893e21e592176670d0c1a1ea76228a9dd22b0
source_version
FDB-0025