Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

VGATE-D-000156

Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.

Blocking_Gap_IDs
GAP-C-000004|GAP-C-000006|GAP-C-000013|GAP-C-000019|GAP-C-000024
Domain_ID
D07
Gate_Status
CONTROLLED_TEST_REQUIRED
Required_Boundary_Condition
NOT_EXPLICIT_IN_VALIDATION_RECORD
Required_Data
RAW_AND_REDUCED_MEASUREMENT_DATA|EQUIPMENT_CALIBRATION_OR_PERSONNEL_RECORDS
Required_Documentation
EXPLICIT_IN_VALIDATION_REQUIREMENT
Required_Instrumentation
EXPLICIT_IN_VALIDATION_REQUIREMENT
Required_Test
Retain method validation or verification, calibration chain, uncertainty or capability basis, sample identity and handling, deviations, raw data, and authorized report.
Target_ID
REL-D-000156
Target_Type
ENGINEERING_RELATIONSHIP
Unlock_Condition
Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
Validation_Gate_ID
VGATE-D-000156
Validation_IDs
VAL-C-000156

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
source_file_sha256
d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
source_locator
csv:row:156
fields_sha256
7abe5a5a4264054f16047206eb4084dcd91d320b6bc0d73822a585039c7f2f7d
source_version
FDB-0025