FDB-0025 ยท ORIGINAL SOURCE VALUE
VGATE-D-000286
Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.
- Blocking_Gap_IDs
- GAP-C-000031|GAP-C-000034|GAP-C-000035
- Domain_ID
- D13
- Gate_Status
- CONTROLLED_TEST_REQUIRED
- Required_Boundary_Condition
- EXPLICIT_IN_VALIDATION_REQUIREMENT
- Required_Data
- PROCESS_CONDITION_OR_LOAD_RECORDS|RAW_AND_REDUCED_MEASUREMENT_DATA
- Required_Documentation
- NOT_EXPLICIT_IN_VALIDATION_RECORD
- Required_Instrumentation
- NOT_EXPLICIT_IN_VALIDATION_RECORD
- Required_Test
- Create a channel checklist covering axis alignment, transverse sensitivity, base bending, cable routing and restraint, temperature, field exposure, connector security, torque, noise floor, and pretest and post-test functional checks.
- Target_ID
- REL-D-000286
- Target_Type
- ENGINEERING_RELATIONSHIP
- Unlock_Condition
- Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
- Validation_Gate_ID
- VGATE-D-000286
- Validation_IDs
- VAL-C-000286
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
- source_file_sha256
- d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
- source_locator
- csv:row:286
- fields_sha256
- 64ed1ed0b46a266f9c40e90b040e682fe99d2d92e2715ba86db70c3530813317
- source_version
- FDB-0025