Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

RAW-G-B1-000105

Registry: raw_content_extraction_registry. Original field names and values are displayed without translation or reinterpretation.

Extraction_Method
ARTIFACT_TOOL_CELL_EXTRACTION
Extraction_Notes
Product specification declaration; not treated as measured data.
Internal_File_ID
INTFILE-G-B0-004121
Language
ZH_OR_MIXED
Raw_Content
系列中英文名: ShockBrige Series 减震桥接系列 | 产品中英文名: Aerrow 箭羽 | 模具型号: FC002 | 工艺: 半热压 | 厚度: 16mm | 拍芯结构: PP蜂窝减震桥接 | 拍面材质: T700磨砂 | 尺寸: 长度:414mm/16.3-inch 宽度:192mm/7.56-inch 握把长度:140mm/5.51-inch 握把周长:110mm/4.33-inch
Raw_Content_ID
RAW-G-B1-000105
Raw_Content_SHA256
a378b385cfa02c9e2aef6f56db41dafc2cfb830e823570f2063fcbda7482d586
Raw_Content_Type
STRUCTURED_PRODUCT_CONFIGURATION_ROW
Source_ID
SRC-G-B1-000002
Source_Locator
Sheet1!A45:L45
Source_Mutation
NO

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/stage_g_b1_internal_evidence_qualification/approved_payload/STAGEG_INTERNAL_EVIDENCE_EXTRACTION_QUALIFICATION_DATABASE_REV1.zip!/STAGEG_INTERNAL_EVIDENCE_EXTRACTION_QUALIFICATION_DATABASE_REV1/extraction/raw_content_extraction_registry.csv
source_file_sha256
447404e172c19b50e918f89d02145f134c6de9ad02d9e6ded3e42610f40fdf4b
source_locator
csv:row:105
fields_sha256
7631e74bb0778f668c2c120cb221853e2385574ac0be14cf9735a7a673a2ec3c
source_version
FDB-0025