FDB-0025 · ORIGINAL SOURCE VALUE
ACQREQ-G-B4-000160
Registry: acquisition_requirement_consolidation_registry. Original field names and values are displayed without translation or reinterpretation.
- Acquisition_Requirement_ID
- ACQREQ-G-B4-000160
- Can_Be_Satisfied_By_Existing_Record
- YES_EXISTING_RECORD_FIRST
- Consolidation_Reason
- One existing-record search gate is retained for GAP-C-000028 and its frozen Stage E/Stage F package before any contingent new test is authorized.
- Engineering_Domain
- STRUCTURAL|PRODUCT_CONFIGURATION
- Priority
- P1_OPEN_GAP_EXISTING_RECORD_SEARCH
- Related_Conditional_Evidence_Count
- 0
- Related_Conditional_Evidence_IDs
- NONE_DIRECTLY_MAPPED
- Related_Gap_IDs
- GAP-C-000028
- Required_Batch_or_Lot
- APPLICABLE_BATCH_LOT_OR_SERIAL_REQUIRED
- Required_Material
- APPLICABLE_MATERIAL_IDENTITY_TO_BE_DECLARED
- Required_Model_or_Family
- APPLICABLE_COMPANY_MODEL_OR_FAMILY_TO_BE_DECLARED
- Required_Process
- APPLICABLE_PROCESS_AND_PROCESS_REVISION_REQUIRED
- Required_Record_or_Test
- Obtain controlled drawings and as-built records, map local loads and restraints, and qualify representative discontinuity and interface specimens with inspection and failure-mode documentation.
- Required_Revision
- DOCUMENT_ID_REVISION_EFFECTIVITY_AND_CHANGE_HISTORY_REQUIRED
- Required_SKU
- APPLICABLE_SKU_TO_BE_DECLARED
- Required_Test_Context
- STRUCTURAL_TEST
- Requirement_Category
- TEST_REPORT
- Requires_Calibration_Record
- YES_AS_APPLICABLE
- Requires_Internal_Engineering_Record
- NO
- Requires_Material_Identity
- YES_AS_APPLICABLE
- Requires_New_Test
- NO_AT_THIS_ACTION
- Requires_Production_Record
- NO
- Requires_QA_Record
- YES_AS_APPLICABLE
- Requires_Sample_Identity
- YES
- Requires_Supplier_Document
- NO
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/stage_g_b4_internal_evidence_acquisition_campaign/approved_payload/STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_DATABASE_REV1.zip!/STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_DATABASE_REV1/planning/acquisition_requirement_consolidation_registry.csv
- source_file_sha256
- 4f0884d93a6c583b7b495c8656103207b65c1d6e7222b524741247bfc096277d
- source_locator
- csv:row:160
- fields_sha256
- 395e3fc4c46578f7213b2040a25858e46d55fbcd606884e0c5039f693eb364f2
- source_version
- FDB-0025