Skip to content
APEX TECHNICAL

G-C2 REV0 · ORIGINAL SOURCE VALUE

DRAW-G-C2-000001-10

Registry: drawing_requirement_registry. Original field names and values are displayed without translation or reinterpretation.

cad_status
NO_CAD_GENERATED
configuration_id
AER-FC002-16-T700-PP-SHP
data_class
MODEL_DERIVED_ENGINEERING_DEFINITION
drawing_release_status
NOT_RELEASED
drawing_requirement_id
DRAW-G-C2-000001-10
empirical_status
NOT_EMPIRICAL
inspection_points
Incoming material, layup, post-mold, trimmed and finished checkpoints
model_support_status
ENGINEERING_REQUIREMENT
parent_candidate_id
DESIGN-G-C1-000001
physical_validation_status
NOT_COMPLETED
prototype_id
PROTO-G-C2-000001
relationship_label
MODEL-DERIVED / ENGINEERING DEFINITION / NOT EMPIRICAL
requirement_type
INSPECTION_PLAN
source_basis
Required to link as-built state to model inputs
target_or_requirement
DEFINE_DATUMS_AND_LAYER/THICKNESS/CORE/INTERFACE_CHECKPOINTS
tolerance
TO_BE_VALIDATED
unit
N/A

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
15f9a53e8b5d42a959283f344c6fd0cd5c5c5449358a77e5d318d0bce3828e84
virtual_path
!/STAGEG_C2_PROTOTYPE_ENGINEERING_DEFINITION_REV0/drawing_requirement_registry.csv
source_file_sha256
f7fc63d04ffbd7add2ab987aafaa4c23ee8163b2bb692e2a75b422c0a863809b
source_locator
csv:row:10
fields_sha256
e24b431208b1e87d855a5798428f1b428095bda626f82469bdc3b63cb25c3d67
source_version
G-C2 REV0