Skip to content
APEX TECHNICAL

FDB-0025 · ORIGINAL SOURCE VALUE

VGATE-D-000085

Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.

Blocking_Gap_IDs
GAP-C-000008|GAP-C-000010|GAP-C-000011|GAP-C-000021|GAP-C-000028
Domain_ID
D10
Gate_Status
PADDLE_DATA_REQUIRED
Required_Boundary_Condition
EXPLICIT_IN_VALIDATION_REQUIREMENT
Required_Data
SPECIMEN_OR_ARTICLE_CONFIGURATION|PROCESS_CONDITION_OR_LOAD_RECORDS|RAW_AND_REDUCED_MEASUREMENT_DATA
Required_Documentation
NOT_EXPLICIT_IN_VALIDATION_RECORD
Required_Instrumentation
NOT_EXPLICIT_IN_VALIDATION_RECORD
Required_Test
Characterize hole quality and local laminate, then test representative coupons and the complete transition under the relevant tensile load path.
Target_ID
REL-D-000085
Target_Type
ENGINEERING_RELATIONSHIP
Unlock_Condition
Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
Validation_Gate_ID
VGATE-D-000085
Validation_IDs
VAL-C-000085

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
source_file_sha256
d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
source_locator
csv:row:85
fields_sha256
a725095109a34ad3575aa8d8e0c411c41a821b6dc1e8222b9d58ce9230f2b7ed
source_version
FDB-0025