Skip to content
APEX TECHNICAL

G-B9 REV0 ยท ORIGINAL SOURCE VALUE

UNC-G-B9-000009

Registry: STAGEG_B9_ENGINEERING_SENSITIVITY_AND_DESIGN_OPTIMIZATION__Uncertainty. Original field names and values are displayed without translation or reinterpretation.

A
UNC-G-B9-000009
B
UPROP-G-B8-000009
C
Interfaces and edge construction
E
OBJ-G-B9-000001|OBJ-G-B9-000002|OBJ-G-B9-000003|OBJ-G-B9-000004|OBJ-G-B9-000007
G
PRED-G-B7-000012|PRED-G-B7-000013|PRED-G-B7-000014|PRED-G-B7-000015|PRED-G-B7-000016|PRED-G-B7-000017|PRED-G-B7-000018|PRED-G-B7-000019
H
HIGH_NO_INTERFACE_INPUT
I
VERY_HIGH_OMITTED_INTERFACE_AND_EDGE_PHYSICS
J
YES โ€” omitted interface/edge mechanisms can jointly affect multiple structural conclusions
K
HIGH_BONDLINE_EDGE_AND_LOCAL_DAMAGE_UNKNOWN
L
VERY_HIGH_FIRST_ORDER_MODEL_BOUNDARY
M
YES
N
YES
O
Penalize changed factors using their frozen uncertainty ordinal and retain this path as a qualitative limitation; never convert internal agreement into higher confidence.
P
Downstream confidence equals the minimum defensible upstream source/configuration confidence and model maturity; shared-input agreement or scenario correlation never raises confidence.
Q
VERY_LOW
R
Replace assumptions/candidate-family inputs with controlled measurements and compare through the linked G-B7 future-actual interface.
S
AER-FC002-16-T700-PP-SHP
T
MODEL_DERIVED
U
MODEL-DERIVED / NOT EMPIRICAL
V
NOT_EMPIRICAL
W
NOT_PERFORMED

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
24b3b7accd68728d0c0e35222da86bf55e015cc4e2369d97f455399a1662f8cf
virtual_path
!/STAGEG_B9_ENGINEERING_SENSITIVITY_AND_DESIGN_OPTIMIZATION_REV0/STAGEG_B9_ENGINEERING_SENSITIVITY_AND_DESIGN_OPTIMIZATION.xlsx
source_file_sha256
fedd72dfc37d0a12ad3e7118ab6bebf8bb8c466136ec668b83c779a6698c255c
source_locator
xlsx:sheet:12:Uncertainty:row:10
fields_sha256
45ab43e6fc1ecb56964e8b189019729388a6f777ada9684b8557463fbdfd0e8e
source_version
G-B9 REV0