FDB-0025 · ORIGINAL SOURCE VALUE
VGATE-D-000223
Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.
- Blocking_Gap_IDs
- GAP-C-000005|GAP-C-000009|GAP-C-000017|GAP-C-000026|GAP-C-000032
- Domain_ID
- D03
- Gate_Status
- PADDLE_DATA_REQUIRED
- Required_Boundary_Condition
- EXPLICIT_IN_VALIDATION_REQUIREMENT
- Required_Data
- MATERIAL_IDENTITY_DATA|SPECIMEN_OR_ARTICLE_CONFIGURATION|PROCESS_CONDITION_OR_LOAD_RECORDS|RAW_AND_REDUCED_MEASUREMENT_DATA
- Required_Documentation
- EXPLICIT_IN_VALIDATION_REQUIREMENT
- Required_Instrumentation
- NOT_EXPLICIT_IN_VALIDATION_RECORD
- Required_Test
- Test representative foam, facing, and adhesive assemblies; record specimen type, bond preparation and cure, dimensions, temperature, humidity, machine speed, peak load, stress calculation, and failure location.
- Target_ID
- REL-D-000223
- Target_Type
- ENGINEERING_RELATIONSHIP
- Unlock_Condition
- Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
- Validation_Gate_ID
- VGATE-D-000223
- Validation_IDs
- VAL-C-000223
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
- source_file_sha256
- d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
- source_locator
- csv:row:223
- fields_sha256
- 1f9d491f37c957cb3cf0d083ba5bed5c99ac30eac866f45bd923b7b80743009f
- source_version
- FDB-0025