FDB-0025 · ORIGINAL SOURCE VALUE
VGATE-D-000258
Registry: validation_gate_registry. Original field names and values are displayed without translation or reinterpretation.
- Blocking_Gap_IDs
- GAP-C-000011|GAP-C-000013|GAP-C-000019|GAP-C-000024|GAP-C-000029
- Domain_ID
- D07
- Gate_Status
- CONTROLLED_TEST_REQUIRED
- Required_Boundary_Condition
- NOT_EXPLICIT_IN_VALIDATION_RECORD
- Required_Data
- REFERENCE_OR_ACCEPTANCE_BASIS
- Required_Documentation
- EXPLICIT_IN_VALIDATION_REQUIREMENT
- Required_Instrumentation
- NOT_EXPLICIT_IN_VALIDATION_RECORD
- Required_Test
- Create a defect-class coverage matrix, qualify complementary methods across depth and location, conduct blinded trials, record inaccessible regions and false decisions, and obtain engineering approval for coverage and acceptance.
- Target_ID
- REL-D-000258
- Target_Type
- ENGINEERING_RELATIONSHIP
- Unlock_Condition
- Provide the recorded required data, complete the recorded test or evidence requirement, retain the stated boundary, instrumentation, and documentation conditions, and resolve or control the listed gap linkage through independent validation.
- Validation_Gate_ID
- VGATE-D-000258
- Validation_IDs
- VAL-C-000258
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_VALIDATION_EXECUTION_READINESS_REV1_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_CONTROLLED_VALIDATION_BATCH_PLAN_2026-09-14.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_ACQUISITION_CAMPAIGN_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_THIRD_PARTY_INDUSTRY_EVIDENCE_AUGMENTATION_REV2_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CONDITIONAL_EVIDENCE_ENRICHMENT_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_INTERNAL_EVIDENCE_QUALIFICATION_REV1_2026-09-13.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_INTERNAL_RAW_DATA_INVENTORY_REV1_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_EVIDENCE_INTAKE_PREPARATION_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEF_TEST_READINESS_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEE_CONTROLLED_VALIDATION_PLANNING_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_REASONING_LAYER_2026-09-12.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGED_ENGINEERING_INTELLIGENCE_LAYER_2026-09-11.zip!/stage_d_engineering_intelligence_layer/approved_payload/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1.zip!/STAGED_ENGINEERING_INTELLIGENCE_LAYER_DATABASE_REV1/intelligence/validation_gate_registry.csv
- source_file_sha256
- d765e793e9c0dc3a5f08b05e29f9feada87355016094ab80eebe5fe49a57e079
- source_locator
- csv:row:258
- fields_sha256
- cb9837d868a2fe19a0213e3cae00d3d370c907ac9927cdbfc8b64cc943bce4e5
- source_version
- FDB-0025