FDB-0025 · ORIGINAL SOURCE VALUE
LEV-G-B8-000006
Registry: STAGEG_B8_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1__Design_Levers. Original field names and values are displayed without translation or reinterpretation.
- A
- LEV-G-B8-000006
- B
- Core density and thickness
- C
- core_density_kg_m3|core_thickness_mm
- D
- DRV-G-B8-000010|DRV-G-B8-000006
- E
- PRED-G-B7-000003|PRED-G-B7-000013|PRED-G-B7-000014|PRED-G-B7-000015
- F
- PRED-G-B7-000003|PRED-G-B7-000013|PRED-G-B7-000014|PRED-G-B7-000015
- G
- Increasing density or effective core thickness increases modeled core areal mass; thickness also changes stiffness/deflection and shear-limit pathways.
- H
- HIGH
- I
- HIGH; 4/5
- J
- HIGH|MEDIUM
- K
- Core procurement, machining/tolerance, mass and dimensional control.
- L
- ASSUMPTION|REFERENCE_SUPPORTED_CANDIDATE_FAMILY
- M
- Mass and balance increase may trade against stiffness/load-limit effects; total thickness remains fixed at 16 mm.
- N
- PROMISING_BUT_UNCERTAIN
- O
- INVESTIGATE_FIRST if max driver score >=65 and at least medium controllability; PROMISING_BUT_UNCERTAIN if modeled sensitivity >=0.25; LOW_PRIORITY otherwise; fatigue calibration-only or missing numeric basis => INSUFFICIENT_BASIS.
- P
- SCN-G-B8-000004
- Q
- Balance core areal mass, geometry, shear stiffness and load limit; no finished-paddle mass prediction is claimed.
- R
- WHAT_IF_ONLY_NOT_A_RELEASED_DESIGN_CHANGE
- S
- AER-FC002-16-T700-PP-SHP
- T
- MODEL_DERIVED
- U
- MODEL-DERIVED / NOT EMPIRICAL
- V
- NOT_EMPIRICAL
- W
- Verify by controlled measurement, update the linked future calibration hook, and reassess failure interactions before any design decision.
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
DRV-G-B8-000010DRV-G-B8-000006PRED-G-B7-000003PRED-G-B7-000013PRED-G-B7-000014PRED-G-B7-000015SCN-G-B8-000004AER-FC002-16-T700-PP-SHP
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/stage_g_b8_cross_test_correlation_and_paddle_engineering_profile/approved_payload/STAGEG_B8_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/STAGEG_B8_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1/STAGEG_B8_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1.xlsx
- source_file_sha256
- 31a2907061ff3872f5527d842231a868f558ee78438db36e70cf8aeb2a3f4a03
- source_locator
- xlsx:sheet:13:Design Levers:row:7
- fields_sha256
- 601fec19919dea3ee7afa9568c2bea3fae22434417d8be023d7112e4cc1afc9f
- source_version
- FDB-0025