ORIGINAL SOURCE CONTENT · FDB-0025
BATCH1_HANDOVER_REPORT.md
The text below is original source material, not a translated website interface or empirical validation claim.
SHA-256 ace7f7913fc086439550a6fc513b7aed0c044e88d80912fea9d71982497fb389
# BATCH 1 R1 — Phase Lifecycle & Authority Governance Handover ## Dependency Batch1 R1 continues to use the frozen Batch0 audit baseline by reference only: - `PICKLEBALL_DATABASE_BATCH0_AUDIT_HANDOVER_R2.zip` - SHA-256: `1c775412663cf23bcb4f4fd44e607c17776a9ccaa600ef74195fccd082ce6491` - Embedded in Batch1 R1 ZIP: **NO** Batch0 files were not modified. Source Phase1–20E / GEO-AEO v19 records were not modified. No external research was performed. Batch2 was not started. ## R1 correction summary - Phase11 Batch01 remains `AUTHORITATIVE_FROZEN`; no lifecycle demotion or promotion was made. - Failed audit `ART-E35B00D2EC33D2D0` is preserved as `HISTORICAL_REFERENCE` with `audit_verdict = REPAIR_REQUIRED` and is excluded from positive authority. - Final audit `ART-ECBF9B0C2CD91D71` is the valid positive evidence for Batch01 acceptance/freeze because it verifies the exact Batch01 SHA as `EXACT MATCH TO ACCEPTED BASELINE` and explicitly records Batch01 as `FROZEN`. - `SEV-00060` now cites the valid final audit; `SEV-00061` uses reviewer type `INDEPENDENT_AUDITOR`. - `audit_verdict` and evidence-role separation were added to prevent independent-audit artifact type from being mistaken for a positive verdict. - Historical failure chain is preserved through `SEV-00103` rather than erased. - New QA `NO_NEGATIVE_AUDIT_USED_AS_POSITIVE_AUTHORITY` passes with zero positive-authority violations. ## Preserved governance conclusions - Phase1–11 accepted/frozen conclusions remain unchanged. - Phase10 DRAFT filename remains subordinate to Level A/B exact authority evidence. - Phase11 semantic boundary `INDUSTRY_GEOMETRY_ARCHETYPE != FACTORY_OWNED_MOLD` remains unchanged. - Phase12–20E remain current candidates with independent acceptance/freeze not confirmed. - Phase12 supersession ambiguity remains unresolved rather than guessed. - GEO/AAO v19 remains `DEPRECATED_LEGACY` / `LEGACY_ONLY`. - No upstream ZIP nesting is introduced. ## Handover statistics - Governed phases/subphases/work packages/revisions: **30** - Governed artifact identities: **62** - Authoritative frozen artifact identities: **9** - Current candidate artifact identities: **17** - Superseded artifact identities: **0** - Deprecated/legacy artifact identities: **2** - Unresolved governance exceptions: **20** - Confirmed artifact relationship rows: **9** - Unresolved/unconfirmed artifact relationship rows: **3** - Status events: **103** - Known independent audit records classified: **6** - Negative audit records: **1** - Negative audits used as positive authority after R1: **0** - QA PASS: **20** - QA REVIEW: **1** - QA FAIL: **0** ## Remaining known limitations 1. Phase1–9 accepted/frozen lifecycle is established by governance records, but exact earlier accepted package byte identities/hashes are not fully present in the current master package; the existing QA REVIEW remains a traceability limitation, not a demotion. 2. Phase12–20E still require independent review before any promotion. 3. Phase12 bridge/OEM family replacement scope remains unresolved. 4. R1 did not reopen unrelated Batch1 findings or run a new full Batch1 audit. ## Stop condition Batch1 R1 deliverables are complete. Batch2 has not been started. **STATUS: READY FOR INDEPENDENT RE-AUDIT**Download exact original