FDB-0025 ยท ORIGINAL SOURCE VALUE
UNC-G-B7-000001
Registry: STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1__Uncertainty. Original field names and values are displayed without translation or reinterpretation.
- A
- UNC-G-B7-000001
- B
- PRED-G-B7-000001
- C
- TESTACT-G-B4-000020
- D
- LOW
- E
- Traceable generic source or method plus explicit assumptions; no company-specific material identity or physical calibration.
- F
- HIGH_METHOD_OR_MANUFACTURER_PRIMARY
- G
- LOW
- H
- MEDIUM_TO_HIGH
- I
- HIGH
- J
- HIGH
- K
- 13.8889
- L
- Actual PP grade and cell architecture
- M
- Engineering envelope, not a statistically calibrated confidence interval.
- N
- Engineering prediction for the declared Aerrow/FC002/T700/16 mm PP honeycomb/semi-hot-press working configuration under stated assumptions. The declared configuration is not proof of as-built material identity, lot identity, laminate architecture, bondline, or actual physical performance.
- O
- CALCULATED
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/stage_g_b7_first_engineering_predictive_validation/approved_payload/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1_2026-09-14.zip!/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1.xlsx
- source_file_sha256
- b1b1b10220f1d28fd2208ca76c5895f160a468a7cd948d219ed3494acb160483
- source_locator
- xlsx:sheet:7:Uncertainty:row:2
- fields_sha256
- 237249366260a198448eb83f0cc379913ca22812a2908732c1a8dddb2474a723
- source_version
- FDB-0025