Skip to content
APEX TECHNICAL

FDB-0025 ยท ORIGINAL SOURCE VALUE

UNC-G-B7-000001

Registry: STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1__Uncertainty. Original field names and values are displayed without translation or reinterpretation.

A
UNC-G-B7-000001
B
PRED-G-B7-000001
C
TESTACT-G-B4-000020
D
LOW
E
Traceable generic source or method plus explicit assumptions; no company-specific material identity or physical calibration.
F
HIGH_METHOD_OR_MANUFACTURER_PRIMARY
G
LOW
H
MEDIUM_TO_HIGH
I
HIGH
J
HIGH
K
13.8889
L
Actual PP grade and cell architecture
M
Engineering envelope, not a statistically calibrated confidence interval.
N
Engineering prediction for the declared Aerrow/FC002/T700/16 mm PP honeycomb/semi-hot-press working configuration under stated assumptions. The declared configuration is not proof of as-built material identity, lot identity, laminate architecture, bondline, or actual physical performance.
O
CALCULATED

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/stage_g_b7_first_engineering_predictive_validation/approved_payload/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1_2026-09-14.zip!/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1.xlsx
source_file_sha256
b1b1b10220f1d28fd2208ca76c5895f160a468a7cd948d219ed3494acb160483
source_locator
xlsx:sheet:7:Uncertainty:row:2
fields_sha256
237249366260a198448eb83f0cc379913ca22812a2908732c1a8dddb2474a723
source_version
FDB-0025