Skip to content
APEX TECHNICAL

FDB-0025 ยท ORIGINAL SOURCE VALUE

ENV-G-B7-000003

Registry: STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1__Property_Envelopes. Original field names and values are displayed without translation or reinterpretation.

A
ENV-G-B7-000003
B
PRED-G-B7-000003
C
TESTACT-G-B4-000020
D
CFG-B001-AERROW-FC002-16-T700-PP-SHP-REV1
E
Core areal mass
F
kg/m2
G
0.87
H
1.08
I
1.224
J
NOT_ESTABLISHED
K
NOT_ESTABLISHED
L
NOT_ESTABLISHED
M
Prediction-model envelope, not an acceptance specification or design allowable.
N
Engineering prediction for the declared Aerrow/FC002/T700/16 mm PP honeycomb/semi-hot-press working configuration under stated assumptions. The declared configuration is not proof of as-built material identity, lot identity, laminate architecture, bondline, or actual physical performance.
O
CALCULATED

Identifiers mentioned in source fields

These are search links, not inferred engineering relationships.

Provenance

archiveSha256
ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
virtual_path
!/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/stage_g_b7_first_engineering_predictive_validation/approved_payload/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1_2026-09-14.zip!/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1.xlsx
source_file_sha256
b1b1b10220f1d28fd2208ca76c5895f160a468a7cd948d219ed3494acb160483
source_locator
xlsx:sheet:4:Property Envelopes:row:4
fields_sha256
bd5f4d5d56c655cffa3c8967f068600986cda7f228ba1249a17edd902279e8c0
source_version
FDB-0025