FDB-0025 · ORIGINAL SOURCE VALUE
EFM-G-B7-000004
Registry: STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1__Failure_Modes. Original field names and values are displayed without translation or reinterpretation.
- A
- EFM-G-B7-000004
- B
- TESTACT-G-B4-000022
- C
- GAP-C-000027
- D
- CFG-B001-AERROW-FC002-16-T700-PP-SHP-REV1
- E
- EXPECTED_FAILURE_MODE
- F
- Core shear, face-core debond, local indentation or face compression damage
- G
- Virtual beam load transfer through unconfirmed face, adhesive and PP core
- H
- Load-deflection, strain, NDT and post-test section inspection
- I
- Competing modes are not ranked because bondline and fixture data are absent.
- J
- NOT_OBSERVED
- K
- PREDICTED
- L
- NOT_EXECUTED
- M
- NOT_PROMOTED
- N
- OPEN
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/stage_g_b7_first_engineering_predictive_validation/approved_payload/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1_2026-09-14.zip!/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1.xlsx
- source_file_sha256
- b1b1b10220f1d28fd2208ca76c5895f160a468a7cd948d219ed3494acb160483
- source_locator
- xlsx:sheet:9:Failure Modes:row:5
- fields_sha256
- 9b1c76c67b60fc0908d44d40c76e9f38726c6de91a8203aee1621f25bfd0c293
- source_version
- FDB-0025