FDB-0025 · ORIGINAL SOURCE VALUE
REF-G-B7-000028
Registry: STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1__References. Original field names and values are displayed without translation or reinterpretation.
- A
- REF-G-B7-000028
- B
- G-B7-EXECUTION-INSTRUCTION
- D
- CONTROLLED_WORKING_CONFIGURATION
- E
- Declared face/core/process
- F
- Aerrow FC002 working configuration
- G
- Controlled working configuration
- J
- T700 matte carbon / PP honeycomb / semi-hot-press
- L
- Stage G-B7 Execution Instruction, section 5
- M
- Declared configuration; not as-built evidence
- N
- Defines the prediction configuration only.
- O
- Material grade, laminate form, resin, adhesive and process parameters remain unconfirmed.
- P
- Stage G-B7 First Engineering Predictive Validation Execution Instruction
- S
- REFERENCE
Identifiers mentioned in source fields
These are search links, not inferred engineering relationships.
Provenance
- archiveSha256
- ded5d3a55705d2387a6fec03fd5fd9c93d948acca3c3de8c66ed7a82fca45cc5
- virtual_path
- !/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_CROSS_TEST_CORRELATION_AND_PADDLE_ENGINEERING_PROFILE_REV1_2026-09-15.zip!/frozen_history/PICKLEBALL_DATABASE_APPROVED_FROZEN_BASELINES_THROUGH_STAGEG_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_REV1_2026-09-15.zip!/stage_g_b7_first_engineering_predictive_validation/approved_payload/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1_2026-09-14.zip!/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1/STAGEG_B7_FIRST_ENGINEERING_PREDICTIVE_VALIDATION_BASELINE_REV1.xlsx
- source_file_sha256
- b1b1b10220f1d28fd2208ca76c5895f160a468a7cd948d219ed3494acb160483
- source_locator
- xlsx:sheet:6:References:row:29
- fields_sha256
- 7653235cd5ba3b2fecc445a34dc53872ed09e24bdb1cbcc283fe481ffc19fe49
- source_version
- FDB-0025